Greek Restaurant “Pantarei”
Indonesia, Bali – 1998
This was the second project completed in Indonesia.
All the design work was done on A4 sheets of paper and faxed directly to the builder. At the time, in 1998, this was the only way to transmit drawings overnight. Bali was still a relatively undeveloped island, with limited access to modern communication or construction technologies.
The project was designed in Italy and built in Bali, despite the six-hour time difference. Traditional measurement methods couldn’t be applied on-site, as the laborers, recruited from local villages, estimated dimensions using their fingers rather than standard tools.
To address this challenge, I based the entire design on 25×25 cm terracotta tiles, a readily available and affordable material at the time. Everything, from the floors to the tabletops, was constructed using these tiles, all according to our original designs.
The custom furnishings were crafted from Benkeray, a durable local wood used throughout the project.
All the design work was done on A4 sheets of paper and faxed directly to the builder. At the time, in 1998, this was the only way to transmit drawings overnight. Bali was still a relatively undeveloped island, with limited access to modern communication or construction technologies.
The project was designed in Italy and built in Bali, despite the six-hour time difference. Traditional measurement methods couldn’t be applied on-site, as the laborers, recruited from local villages, estimated dimensions using their fingers rather than standard tools.
To address this challenge, I based the entire design on 25×25 cm terracotta tiles, a readily available and affordable material at the time. Everything, from the floors to the tabletops, was constructed using these tiles, all according to our original designs.
The custom furnishings were crafted from Benkeray, a durable local wood used throughout the project.
Greek Restaurant “Pantarei”
Indonesia, Bali – 1998
This was the second project completed in Indonesia.
All the design work was done on A4 sheets of paper and faxed directly to the builder. At the time, in 1998, this was the only way to transmit drawings overnight. Bali was still a relatively undeveloped island, with limited access to modern communication or construction technologies.
The project was designed in Italy and built in Bali, despite the six-hour time difference. Traditional measurement methods couldn’t be applied on-site, as the laborers, recruited from local villages, estimated dimensions using their fingers rather than standard tools.
To address this challenge, I based the entire design on 25×25 cm terracotta tiles, a readily available and affordable material at the time. Everything, from the floors to the tabletops, was constructed using these tiles, all according to our original designs.
The custom furnishings were crafted from Benkeray, a durable local wood used throughout the project.
All the design work was done on A4 sheets of paper and faxed directly to the builder. At the time, in 1998, this was the only way to transmit drawings overnight. Bali was still a relatively undeveloped island, with limited access to modern communication or construction technologies.
The project was designed in Italy and built in Bali, despite the six-hour time difference. Traditional measurement methods couldn’t be applied on-site, as the laborers, recruited from local villages, estimated dimensions using their fingers rather than standard tools.
To address this challenge, I based the entire design on 25×25 cm terracotta tiles, a readily available and affordable material at the time. Everything, from the floors to the tabletops, was constructed using these tiles, all according to our original designs.
The custom furnishings were crafted from Benkeray, a durable local wood used throughout the project.